L-Shaped Right Hand Shower Bath & Optional Panels and Shower Screen

No reviews
Product ID: BR-002606

L-Shaped Shower Bath & Optional Panels and Shower Screen: L-Shaped Right Bath
Price:
Sale price£199.99
Stock:
In stock

Delivery Options

  • FREE Standard Delivery For Orders above £200 to UK mainland

Estimate Delivery Times And Fees

📦 Delivery Information

  • All orders are processed within 1-2 business days
  • Tracking information will be sent to your email
  • Signature is required for large items
  • Large items delivered kerbside - please ensure access

Description


This modern bathtub set offers the choice to add bath panels and a bath shower screen. The L-shaped shower baths in this set are intelligently designed to maximize showering space, providing a more comfortable and roomy experience. Included in this set are all the necessary fixtures and fittings for a hassle-free installation process. For added convenience, a chic chrome shower screen is also provided, enhancing the modern elegance of the bathroom. Combining functionality and aesthetics, this comprehensive set is ideal for those seeking to elevate their bathing experience.

Constructed from durable acrylic, this L-shaped bath ensures longevity and easy upkeep. With its right-hand configuration, the wider end of the bath is positioned on the right side, offering a comfortable and spacious bathing area. The sleek square design adds a contemporary touch to your bathroom décor. This versatile bath allows for both showering and bathing, making it a practical and space-saving addition to any bathroom.


  • Durable Acrylic Construction: The Nes Home shower bath is crafted from high-quality acrylic, ensuring a long-lasting and easy-to-maintain bathing solution.
  • Space-saving L Shaped Design: The L-shaped configuration maximizes space in your bathroom, providing a comfortable and functional bathing area.
  • Right Hand Orientation: With the wider end on the right side, this bath offers a convenient and spacious bathing experience, tailored to your preferences.
  • Modern Square Aesthetic: The sleek square design adds a contemporary touch to your bathroom décor, complementing a wide range of styles.
  • Versatile Shower and Bathing Options: This bath allows for both comfortable showering and relaxing bathing experiences, offering a splash prevention bath shower screen.

 

Specification

L-Shaped Shower Bath

  • Bath Type: Acrylic Bath, Shower Bath
  • Length: 1700mm
  • Width: 700mm
  • Width: (at widest point): 850mm
  • Depth: 395mm
  • Water Capacity: 200L
  • Guarantee: 10 Year
  • Finish: White

Front Panel

  • Width: 1695mm
  • Height: 500mm

End Panel

  • Width: 677-697mm
  • Height: 500mm

Shower Screen

  • Width: 800-815mm
  • Height: 1400mm

Complementary products

Select products to display in the block settings

You may also like

Recently viewed