This product is the Front Bath Panel and End Bath Panel for L Shaped Bath
Designed to complement our L-Shaped Baths (Nanuya and others), this panel is crafted with durability and aesthetics in mind. Its crisp white finish brings a fresh and clean look to your bathing space, seamlessly blending with various decor styles. The panel offers a sleek and minimalist design, enhancing the overall appeal of your bathroom while providing practical coverage for the end of your bath. Easy to install and built to last, this end panel is a perfect choice for completing the look of your bath ensemble.
Note: Supports both Left Hand and Right Hand L Shaped Bath
Key Features
- Durable Construction: Crafted from high-quality materials, providing durability and long-lasting performance.
- Easy Installation: Designed for straightforward installation, making it suitable for DIY enthusiasts and professionals alike.
- Sleek Design: Boasts a sleek and minimalist design, adding a touch of elegance to your bathroom decor.
- White Finish: Finished in classic white, offering a timeless look that blends seamlessly with various bathroom styles and color schemes.
Specification
Front Panel
- Finish: White
- Width: 1695mm
- Height: 500mm
- Material: Acrylic
- Thickness: 2mm
End Panel
- Finish: White
- Width: 677-697mm
- Height: 500mm
- Material: Acrylic
- Thickness: 2mm
Package Content
- 1 x End Bath Panel
- 1 x Front Bath Panel